Now
What I am up to as of the lastmod date on top of this page. Not a journal, not a roadmap. A short snapshot, updated whenever it stops being true.
Building#
- The K2 Plus open-Klipper modules. Z-homing second-cycle bug is still the blocker.
- The MeshCore solar relay node on the south-facing fence.
- This blog. The list of posts grows faster than I can write the next one.
Reading#
- Sutton, Rocket Propulsion Elements, slowly.
- The OPNsense source for the
pfreply-to logic, looking for a quirk in the WireGuard reply-path on a multi-WAN setup.
Stuck on#
- The K2 second-cycle Z-homing failure. Current best guess is GIL latency in the main reactor thread.
- A FreeCAD assembly that re-orients its origin every time I open the file. Smells like a reference order bug in my own tree.